Project: I-CAVS   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:paolo cavosi   -  
Project:   Vans - RV-10
Total Hours:2429.2
Total Flight Time:
Start/Last Date:May 28, 2019 - No Finish Date
Engine:IO-540 Thunderbolt Serial # EL-38135-48E
Propeller:MT Propeller MTV-12-B/193-53 serial 22G1268-K
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=I-CAVS

Home or Last Project Picture

Apr 18, 2023     firewall Insulation - (4 hours)       Category: Firewall
Prepared the two fiberfrax parts and cut the right foil. several attempts to fit and trimmed. Glued the foil to the fiberfrax right side and positioned on the firewall. Used masking tape to hold in position. Marked the holes and cut the holes with a cutter. deburred and reinstalled the brake reservoir and the air valve (right).
Blood tribute paid to the God of Steel.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.